MICAH Integrated Solutions
MICAH cleaner vacuuming construction dust from new tiled floors in a bright, newly completed home
All services

Service 01 · Post-Construction Cleaning

From building site to show-ready.

Builders’ cleans delivered in stages — rough, final and sparkle — so new builds and fit-outs are spotless before anyone walks through the door.

Overview

Post-Construction Cleaning

Construction leaves behind far more than visible mess — fine dust settles in vents and tracks, paint and plaster cling to glass and fittings, and protective films hide the finishes underneath. Our staged builders’ clean works alongside your programme so every trade can finish on time and the property is genuinely ready to present.

  • Dust, debris and protective film removal
  • Paint, plaster and adhesive residue lifted
  • Fixtures, glazing, frames and tracks detailed
  • Floors treated to suit the finish
Gloved hand scraping paint specks from a new window pane and wiping the frame with a blue microfibre cloth

What’s included

Every detail, accounted for.

01

Rough clean

Bulk debris, offcuts and packaging cleared and loose dust removed once the main trades finish, so second-fix and finishing work starts on a clean slate.

02

Final clean

Every surface washed top to bottom — walls, doors, skirting, cabinetry, sanitaryware and floors — with paint, plaster, grout haze and adhesive residue lifted.

03

Sparkle clean

A last detailed pass right before handover or occupancy: glazing polished, fittings buffed and any dust that resettled after the snag works removed.

04

Finish-safe methods

Products and tools chosen for each material — sealed stone, timber, stainless, glass and new paintwork — so nothing is scratched, etched or stained.

Ideal for

Who books this service

Builders & contractorsProperty developersRenovations & fit-outsNew homeowners

How it works

  1. 01

    Survey

    We visit or review your site, confirm the scope, timeline and finishes involved.

  2. 02

    Plan

    You receive a clear quote and a schedule that fits around your trades and deadlines.

  3. 03

    Clean

    Our team works through every space using a room-by-room checklist.

  4. 04

    Inspect

    A supervisor checks the work against the checklist and closes any gaps.

  5. 05

    Hand over

    You get a ready-to-occupy space, a photo report and everything in its place.

Common questions

Good to know

When should the clean be booked?

Ideally once you have a programme — we schedule each stage around your trades. A rough clean can usually follow the main works, with the final and sparkle cleans timed for your inspection or handover date.

Do you remove construction waste?

We clear the light debris, packaging and dust created during finishing works. Skip-level waste and heavy materials should be removed by the contractor before we start — we can advise on what’s needed when we survey.

Can you work on a live site?

Yes. Our team follows site safety rules and works around other trades, and we can phase the clean floor by floor or unit by unit.

Explore our other services

All services

Handover day, handled.

Tell us about your site and timeline — we’ll come back with a clear, itemised quote.

Get a free quote